Engineering and design work.

Profile and specialization of CJSC “ERA-Cross Engineering”
1.    Complex works, separate types of work on “turnkey” basis including: design, supply of equipment and materials, installation and commissioning:
1.1    Engineering systems
1.    Development of design assignment for internal engineering systems of object;
2.    Performance of preloading calculations for receiving by the Client of preliminary technical conditions for heating supply, electric power supply and water supply for object;
3.    Development of technical documentation of stage “Design documentation” and “Working documentation” for installation (organization) of the following object’s internal engineering systems:
3.1    OB1 “Heating”;
3.2    OB2 “Ventilation, conditioning, smoke protection”;
3.3    OB3 “Heating supply to ventilation systems”;
3.4    XC “Cold supply”;
3.5    EM “Electrical equipment (internal)”;
3.6    EO “Electrical lighting (internal)”;
3.7    VK “Water supply and sanitation”;
3.8    TC “Individual (Central) heat distribution (supply) center”;
3.9    AOB “Automatization of OB systems”;
3.10    ABK “Automatization of VK systems”;
3.11    DK “Dispatching of engineering systems”;
4.    Approval of above mentioned technical documentation of “Design documentation” stage in extra departmental expertise.
5.    Managing of above mentioned design works.
6.    Supply of equipment and materials of above mentioned internal engineering systems as per project specifications.
7.    Installation and commissioning, service maintenance.
1.2     Electro technical section
1.    Power electrical equipment (projects of models EM, AEP, EG (ЭМ, АЭП, ЭГ):
2.    Power electrical equipment 0.4-10 kV, automated electrical drive, lightning protection and grounding.
3.    Electric power supply (projects of models EC, EP, EK (ЭС, ЭП, ЭК);
4.    Electrical supply networks, distribution substations and cable lines up to 110 kV.
5.    Electrical lighting (projects of models EO, EN (ЭО, ЭН);
6.    Site survey, collection of initial data;
7.    Data updating;
8.    Development of technical and economic feasibilities and technical-commercial proposals;
9.    Development of design assignment for design of electro-technical systems;
10.    Development of electro technical part of design and working documentation for different branches of industry, energy and transport, including objects, regulated by Rostekhnadzor;
11.    Development of task-assignment for plant-manufacturer and data sheets for low-voltage package devices, package transformer substations, high-voltage distributional units with application of modern smart commutation and start-control devices;
12.    Development of tender documentation: inquiry for technical proposal for electro-technical equipment supply;
13.    Technical support of design documentation;
14.    Project expertise;
15.    Designer supervision and technical support (help) during installation and commissioning works;
16.    Supply of equipment and materials for above mentioned systems as per project specifications;
17.     Installation and commissioning, service maintenance.
1.3    Automation section
1.    Automated Process Control System (APCS) of “low” and “high” level;
2.    System of instrumentation and control equipment (I&CE);
3.    Electric power supply automated control system;
4.    Automated information-measuring systems of commercial accounting of electrical power.
5.    Automated information-measuring systems of commercial accounting of electrical power; technological metering system, dispatching system; turbo compressor control system; compressor stations dispatching stations; urban communal service system, including ACS of sewage pumping stations, ACS of sewage treatment plants, ACS of the second rise station, ACS of water intake (water supply point).
6.    Supply of equipment and materials for above mentioned systems as per project specifications;
7.    Installation and commissioning, service maintenance.
1.4    Section of integrated safety systems
1.    Access control system and moving control with differentiated access to zones of different grade of limitation, including automatic units: security alarm system, security CCTV;
2.    Access control systems;
3.    Inspection complex;
4.    Alarm systems and evacuation control system;
5.    Structured cabling system;
6.    Fire alarm and fire suppression system including automatic fire-alarm units (AFAU); fire protection system (AFPS); fire fighting (AFFE) and etc.
7.    Supply of equipment and materials for above mentioned systems as per project specifications;
8.    Installation and commissioning, service maintenance.